Session inactive
Your session will expire soon due to inactivity.
Stay signed in
Session expired
Your session has expired, please refresh to sign back in again
Reload
Sign in
This site uses cookies
(
see more information
)
Accept all cookies
(including optional analytics cookies)
Only essential cookies
University of Warwick Library
Modern Records Centre
Skip to menu
Skip to content
Home
Search
Browse collections
Featured collections
Digital exhibitions
Saved records
(
)
Help
British Steel Corporation, Department of Operational Research... 'Yellow reports', 1956-1972
Actions
Purchase
British Steel Corporation, Department of Operational Research
'Yellow reports', 1956-1972
1956-1972
Series
Open
Add a contribution
Do you have extra information about this item? You can contribute additional detail to our catalogue using the following form:
Submit contribution
British Steel Corporation, Department of Operational Research
'Yellow reports', 1956-1972
You can cite this material using the following reference:
Copy to clipboard
Alternatively, download the citation as:
RIS
Text
Close
British Steel Corporation, Department of Operational Research
'Yellow reports', 1956-1972
Metadata
You can download/export the metadata of this catalogue entry
RDF (xml)
RDF (nTriples)
RDF (JSON-LD)
CSV
Alternatively:
Print this catalogue entry
Digital material
This content is not currently available for download
You can download copies using the following links
Close
Report following a visit to DEC by Mr P G Lucas and Mr E J Reinger
Report on the bar and rod mill production control and communications system - S Fox, by Owen
DEC 1 proposed plan of campaign, by Lucas
Report on stores pilot investigation, by Aczel and Russell
Mill feed problems, by Johnson and Jordan
SPT press and ancillary shops preliminary operational research, by Lucas and Olliver
A discursive account, by Lucas
Internal: proposed learning machine, by Tocher
Fox 5B interim report, by C Green
Production control in the press forge department, by Capstick, Lucas, Jordan, Olliver and Vallance
DEC 1 draft report, by Budge, Johnson, Reinger, Williams, Gander, Lowe and Sandeman
Workington fuel problem, by Tocher and Webb
Preliminary study - TRF, by Bernard
Routine production records, by Lucas
The development of our work on control system, by Beer
A Pegasus computer program for the statistical control of productivity indices, by C-Green and Owen
Production control in the press forge department - supplementary reports, by Lucas
Mill feed problem, by Humphries, Johnson, Russell, Webb and Tocher
The installation of the Pegasus computer, by Owen
Bar and rod mill production control, by Humphries, Owen and Tocher
DEC output-input control, by Heald, Reinger and Lucas
Production control in the press forge department, by Capstick, Lucas and Jordan
Production stabilization mechanisms, by Tocher and O'Donnell
Stock assessment at USS, by Aczel, Hurst and Pearson
Review of accident prevention at Appleby-Frodingham, by Fortescue
TRM extended work study survey, by Budge, Gilbert, Ingleton and Kerse
Work study policy and programme, by Speakman
Report after a visit to the education department at Appleby-Frodingham, by Fortescue
Profits, prices and productivity, TRM, by Budge
The use of Pegasus designing floor structures, by Card, Owen and Hutson
A guide to the clerical work involved in the press forge production control system, by Jordan
The organisation of certain management services at the branches, by Beer
SPT Templeborough planning and progress (first stage): initiation of project, by Jordan
Programming the rod mill, by Hopkins
The information flow at DEC - a systems analysis, by Heald and Reinger
The stockholding of engineering spares for overhead cranes, by Beer, Sharp and Pearson
The optimum use of Appleby soakers and reheaters, by Beer
SPT production control in the press forge department - implementation, by Bodiley, Jordan and Lucas
A suggested automation of furnace procedure, by O'Donnell
A Pegasus computer programme for the statistical control of productivity indices at S Fox, by Mee and Owen
The cost of burning blast furnace gas at Appleby-Frodingham soaking pits, by Johnson and Vallance
A simulation of the operation of Appleby[-Frodingham] reheaters, by Amiry, Johnson and Vallance
Structural design by computer: an outline of further developments, by Card and Owen
The Workington energy control problem, by Weislitzer and Capstick
An investigation into the use of Pegasus to plan and progress the work of the wire department at Fox's, by Mee
Delivery control, by Lucas, Tocher, Sandeman and Tait
A special simulation for soaking pit problems at Workington, by Capstick and Russell
Memorandum of seminar on problems of stockholding, by Ottley and Beer
A Pegasus program for calculating temperature distributions within ingot and mould, by Bowling
Handbook for the USS 2 floor design program mark II, by Hutson and Morgan
Handbook for the general simulation program, by Tocher, Owen and C-Green
Inspection of razor strip - a sequential sampling procedure, by Muir
Templeborough planning and progress: an operational research study, part I, by Jordan and Lucas
Templeborough planning and progress: an operational research study, part II, by Splaine
Templeborough planning and progress: an operational research study, part III, by Laski and Muir
Energy control problem: specification of proposed scheme, by Weislitzer
Operational research in Switzerland, by Reinger
Cybernetic research sub-project, by C-Green
Operational gaming, by Laski
Templeborough planning and progress: an operational research study, parts VI, by Guest
Templeborough planning and progress: an operational research study, parts VII, by Burgess
Maximum demand of an arc furnace shop, by Guest, Owen and Parker
The basic model of the Workington simulation, by Captsick
Work study at TRM (1958-1960), by Gilbert, Ingleton, Kerse and Linney
Templeborough electric melting shop basket loading facilities: an operational research study, by Sharp and Stevens
The cobble detector, by Cybor Laboratory
How to achieve optimum use of Appleby soakers, by Caldwell, Guest, Johnson and Tocher
Templeborough planning and progress: an operational research study, part V, by Linney
Workington Bessemer shop study: the effect of various proposals to shorten the teeming crane cycle, by Capstick and Tocher
Bessemer shop process time as measured by JACK, by Capstick, Splaine and Turner
Process times of cranes in arc furnace shop as measured by JACK, by Capstick, Splaine and Turner
Sickness benefit, by Fortescue, Laski, Pearson and Vallance
Handbook of general simulation programme, volume 1 (revised), by Tocher
Proposals for increasing working stocks of scrap in Templeborough melting shop stockyard, by Johnson, Fosset, Conway, Pease and Price
Process times of soaking pit cranes measured by JACK, by Caldwell, Heald and Splaine
A new scheme for costing works locomotive service, by Fossett
Measurement facilities on JACK, by O'Donnell
Fabricating department rod bending, by Boughton, Fortescue, Gilbert, Kerse and Valance
The use of a computer in the spectrographic laboratory for the new electric melting shop at SPT, by Mee
Utilization of the soaking pits at SPT - a statistical survey, by Wild
Production control by computer analysis of the TRM system, by Hopkins
Investigation of improved stripping bay throughput, by Amiry and Splaine
Spear control, control system for TEMS railway system, by Fossett
Handbook of the general simulation program, volume II, by Tocher
Mill stoppage recorder, by O'Donnell
Manual input to computer games, by Barron
Normal and misfit ingot stocks at Steel, Peech and Tozer, by Johnson
Simulation of maximum demand control by computer, by Atkinson, Conway and Tocher
Soaker control, by Muir and Sandeman
Preliminary study of computer control at Frodingham Section Mills, by Amiry and O'Donnell
Process times in No 1 Mill as measured by JACK, by Dalgetty, Heald and Splaine
A new method of setting performance standards, by Hopkins, Harborne and Wild
Spear Holmes and Fullerton stockyards, by Boughton
Costing of loco[motive] services: application of new scheme to Ickles Area, by Fossett and McQuater
Handbook of the Unisteel Automatic Recorder, by Heald and Splaine
Ajax furnace repairs, by Bayes and Kerse
The cobble detector (complete description), by Barron and O'Donnell
Handbook of the billet stock recorder, by Barron
Linear programming applied to foundry irons, by Howitt
Factors affecting the quality of barcon si-mn steel, by Boothroyd
Steel flow control system at Appleby-Frodingham, by Mellor and Tocher
A description of the Multiple Recession Program mark IV, by Mascas and Osborne
Ventilated garments. A means of protection in moderately hot working conditions, by Gilbert, Kerse and V Risseghem
Work study investigation into movement of local ore traffic at Appleby-Frodingham, by Fossett
Billet cutting at Appleby-Frodingham, by Stevens
Results of study of no 3 mill at Barrow, by Harborne
Procedure for setting up UAR exercise, by Harborne and Hurst
A method of improving yield, by Boothroyd
Costing of loco[motive] service: application of new schemes to SPT loco[motive] service: second report: Ickles Area, by Fossett
Costing of loco[motive] service: application of new schemes to SPT loco[motive] service: second report: Holmes Stockyard Area, by Fossett
Estimation of standard times - straightening machines - McCalls, by McAuley, Phillpotts and Vallance
TEMS railway system, by Fossett
Appleby melting shop stage traffic, by Fasham, Harborne, Maas and O'Donnell
Handbook of the General Simulation Program Mark II, by Tocher and Hopkins
Costing of loco[motive] services. Application of new scheme to TEMS Area, by McAuley
Spear basket crane study, by Amiry and Hankins
Project work on the 'Sapphire' scheme, by Amiry, Hemming, Splaine and Tanton
Section mill cut-up control computer feasibility study, by Hopkins and Ludley
The new scheme for costing works' loco[motive] service, by McAuley
TEMS locomotive performance procedures, by McAuley
Appleby melting shop iron balance, by Hemming
Steelmaking developments at Appleby-Frodingham, by O'Donnell
Bessemer computer control scheme, by Clarkson, Smith and Splaine
Operation of MIXINT/BR-B2 (Backing Store) code, by Ludley
Circuit description of the furnace delay recorder, by Beswick
Maintenance manual for the furnace delay recorder, by Beswick
A feasibility study of on-line computer control of screwdown in the Appleby-Frodingham plate mills, by Devine
Brookhouse coke ovens: ram driver's cabin, by Vallance
A range pre-selector for ray thickness guage, by Beswick
Steelmaking developments at Workington, by LeGassick
An investigation into possible furnace configurations at the Ickles department of Steel, Peech and Tozer, by Bee, Green, Monk and Watson
Templeborough electric melting shop iron balance, by Hemming
Steelmaking developments at Appleby-Frodingham, by O'Donnell
Brookhouse coke ovens: wagon utilization, by Sutton and Phillpotts
S Fox iron balance: financial year 1965/66, by Hemming
Ingot and billet production control: a simulation for scheduling development, by Barrott, Jeremiah and Mellor
Ingot feeder heads, by O'Donnell and Stevens
The 503 symbolic language for aiding plotting, by Tocher, Sickling and Lomas
McCall and Company Limited: material handling investigation at the Ickles warehouse and bending department, by Cooper, Phillpotts and Sutton
Calculation of the tilting moments of the liquid metal contents of an LD vessel, by Morley, Scott and Splaine
Motor vehicle forecasting: a preliminary report, by Climpson and Green
The 503 Supervisor System Mark III, by Tocher
Stock recording at McCall and Company (Sheffield) Limited, by Stevens
Computer model of the blot furnace, by Marsden and Stokes
Small arc furnace order book - an initial report, by Amiry
Commercial and production planning at Appleby-Frodingham Steel Company. An initial appraisal, by Amiry and Green
Anchor soaking pit simulation, by Anderson
Initial studies for an arc furnace process model, by Howes and Payne
The symbolic language for aiding plotting (revised), by Lomas
Cybor House projections of motor vehicle production: an assessment, by Green
Descriptive handbook of the pitside gaming model, by Maas and Tanton
A joint simulation study of a proposed 5 bay scheme for Workington iron and steel Company finishing banks, by Mellor, Boughton (WKN), Amrstrong (WKN) and Barnes
Billet stock listing: system report and system specification, by Thornley
Appraisals of the proposed cosmic scheme, by Hemming
Head Office: central secretarial department, by Sutton and Vallance
An outline of the long term delivery requirements system, by Barrott and Smith
Anchor coiled plate mill stocks, by Climpson
Report and specification of surplus ingot stock listing system, by Hollocks and Thornley
A description of the simulation gaming model, by Thring
An appraisal of proposals for increasing Tinsley Park billet mill output, by J H Hemming
Workington energy balance program, by Anderson, Payne and Sedgwick
Improvements of control equations for possible on-line computer control of screwdown in the Appleby Plate Mills, by Scott and W R Smith
Evaluation of heating and cooling facilities for increases in Tinsley Park production, by Anderson and Saul
The Ajax Predictor - a feasibility study, by S A Marston
Cybor House projections of motor vehcile production: a further assessment, by Donachie and J G Marston
Long-term delivery requirements system operating instructions, by Barrott
Dock improvement scheme, by Holden, Shearn and Sowry
Recommendations to improve the standard stores package, by Hartzig, Mackness and Stevens
Information flow for control in Frodingham melting shop. Implementation of the permanent system, by Marston
Operating instructions for the electric arc furnace cost calculation programs, by Brand, Horsnell and Rodley
Multiple task analysis, by Chappell and Sutton
Production planning and control in Tinsley Park spring works, by Hollocks
A computer based decision-making aid for cast reallocation, by Disley and Stewardson
Casting bay study, by Hollocks and Smith
The pass scheduler for the on-line computer control of the Appleby-Frodingham 12-inch plate mill finishing stand, by Hartzig
Revised cosmic scheme - evaluation of the interaction between the LD plant and the rolling mill, by Pennington and Thring
Estimation of forward working capital, by Holden
1900 trim loss package volume 1 general description, by Bornand
Rationalisation of ingot moulds, by Mulford and Woodman
Aldwarke casting bay capacity, by Hollocks
The Workington Bessemer computer control scheme volume 1, by Tocher, Bowness and Gilliver
The Workington Bessemer computer control scheme volume 2 part I, by Jenkinson
The Workington Bessemer computer control scheme volume 2 part II, by Mackness, Marston and W R Smith
Production planning in the road laminated spring department of Tinsley spring works - the present method, by Cleland, Gilliver and Sharman
1900 trim loss package, vol 2, by Bornand
Foundry production load system operating instructions, by Rutter
A printer test set, by Cousins
Blast furnace burden calculations, by Handley and Peak
Project 'Atoms' - casting plant requirements - final report, by Hollocks
Rail co-ordinates, by du Feu
The effect of casting bay limitations on future arc furnace performance, by Hollocks
Layout of electrode coating plant - Orgreave Works, Chemicals Division, by Clegg and Ballard
Brymbo melting shop performance - charging and scrap bays, by Hollocks
Progress report - foundry production control by computer, by Barrott and Graveling
Orgreave electrode coating plant - machinery requirements, by Beaumont
A production planning model of the Scunthorpe complex, by Hartzig
An appraisement of soaking pit requirements at Hallside, by Marston
SLOP - Symbolic Language to Operate the Plotter, by Brand
Machine tool plotter program, by Long and Bower
A computer-based information system to aid soaking pit and mill scheduling, by Disley and Scott
Production planning and control at Tinsley Park spring works: a summary of Management Services Centre work, by Sutton
Supplement to operating instructions for electric arc furnace program, by W A Barraclough
B.I.G. A Basic Implementation of the General Simulation Program, by Hollocks
Adaptive control in the standard stores package, results of trial, by Hartzig
Brymbo melting shop performance - results from combined charging and pit side model, by Hollocks and Horton
The price of scrap in the Common Market, by Haworth and Stewardson
A divisional transport information system, by Saynor, Hartzig, Horton and Wilce
The price of scrap in the UK, by Disley, Haworth and Stewardson
B.I.G. [Basic Implementation of the General Simulation Program] - further facilities, by Hollocks, Cooke and Johnson
Templeborough production control - soaker scheduling, by Disley, Scott, Banham, Cousins and Stewardson
Planning and control of Brymbo works blastfurnace reline using network analysis techniques, by Beaumont and Hollocks