Session inactive

Your session will expire soon due to inactivity.

Session expired

Your session has expired, please refresh to sign back in again
Sign in
This site uses cookies (see more information)
Accept all cookies (including optional analytics cookies) Only essential cookies
University of Warwick Library Modern Records Centre
  • Skip to menu
  • Skip to content

  • Home
  • Search
  • Browse collections
  • Featured collections
  • Digital exhibitions
  • Saved records ()
  • Help

GKN Operational Research Reports... British Steel Corporation: Scottish, Shelton and East Moors Group, 1970-1976


Actions
Purchase
  • GKN Operational Research Reports
  • Reports and Memoranda
  • British Steel Corporation: Scottish, Shelton and East Moors Group, 1970-1976

  • 1970-1976
  • SubSeries
  • Open

Add a contribution

Do you have extra information about this item? You can contribute additional detail to our catalogue using the following form:
  • GKN Operational Research Reports
  • Reports and Memoranda
  • British Steel Corporation: Scottish, Shelton and East Moors Group, 1970-1976

You can cite this material using the following reference:
Alternatively, download the citation as:
  • GKN Operational Research Reports
  • Reports and Memoranda
  • British Steel Corporation: Scottish, Shelton and East Moors Group, 1970-1976

Metadata

You can download/export the metadata of this catalogue entry
Alternatively:

Digital material

This content is not currently available for download
You can download copies using the following links

About  |  Cookies  |  Privacy  |  Accessibility

Epeχio by Metadatis

Guide to the economic model of East Moors Works - The meeting shop Guide to the economic model of East Moors Works - The ironmaking area Guide to the economic model of East Moors Works - The Greigian quarry and coke oven areas Methods of Morgan Mill billet cut-up optimisation Planning for a new works Review and control of absenteeism with handwritten comment on the poor report Investigation into factors affecting rimming yield Linear programming model Steel ladle cycle in the melting shop Method of coding plant Feasibility of installing a computerised re-order advising system Statistical analysis of steelmaking behaviour with the Lackenby ladles Work of the coke ovens foremen Work of the coke ovens The assembly of six-way upteem Continuous mill roll changing Billet traffic movements between East Moors Works and GKN (South Wales) Ltd. Workload of the sinter plant sampler technicians Automatic time recording system design Stocking of ingots Energy balance for East Moors Works Accounting stock control and evaluation by computer External desulphurisation of iron Simulation of number 3 cooling bed during the rolling of 50 foot billets Magnetic inspection unit Magnet spacings for 50 foot billets The falling from magnets of 50 foot billets